Aug
17

Aug
16

The Yellow Electric Tower Crane (TC2) that has been on site since 24th October 2016 is being removed and dismantled commencing Monday 11th September 2017. The process to remove the crane is a complicated job and is very weather dependant. Our builder Multiplex has allowed one week to carry out the works, that being 11th to 14th September 2017. As this removal process is complex to dismantle TC2, the west bound lanes of Mitchelle Drive will be required to be closed to enable a 500 tonne mobile crane to assist in the TC2 dismantle to be established. The mobile crane will assist and permit to laydown and haulage of the TC2 jib and crane sections. West bound lanes of Mitchell Drive will be closed to create a works zone, this will be offset by a contraflow across the East Bound lanes of Mitchell Drive, under a 24 hours traffic management program. Hunter Valley Bus Stops will be maintained throughout the duration of the works. Pedestrian access through the work zone will not be maintained, however, dedicated pedestrian walkways under traffic management control will be established to safely guide pedestrians to the opposing (north) side of Mitchell Drive. Stockland will ensure any disruptions are kept to a minimum and apologise for any inconvenience that may be caused.

Read more
Aug
2

Next month, Stockland will deliver a range of first class amenities ensuring the new Stockland Green Hills is an inclusive shopping centre for all. As part of the $412 million redevelopment, Stockland will deliver brand new premium bathrooms and a five star Parents Room including change tables, private feeding rooms, a microwave to warm bottles and a play area for the kids. Disability amenities including an Adult Change room with a changing table and assistance lifter will also open in September to assist carers and people with a disability.

Read more
Aug
1

Dreaming of a new home? You will find it at the beautiful Stockland McKeachie's Run.

Read more
Jul
5

Power Up at Stockland

Stockland is powering up in innovation, rolling out universal ChargePoint Electric Vehicle (EV) and dedicated Tesla Destination Chargers across 31 of our shopping centres. Electric Vehicles and Tesla owners will be able to charge their cars for free in Stockland retail centres, boosting convenience for our customers while they shop, dine or spend time with family and friends.

Read more
1 2
Load more
No more events!