Sustainability and Environment
Springfield Rise at Spring Mountain incorporates a range of residential areas, public and private open space, preservation of environmentally significant areas, an integrated transport network and retail precincts that work in harmony with the major town centre of Orion Springfield Central.
The subdivision of layouts at Springfield Rise at Spring Mountain will be based on a formulated grid to achieve desirable solar orientation, leafy streets, surveillance of public spaces and walkable neighbourhoods – and to enhance the community’s perception of a sense of place.
A large open space network will be delivered, including linear, local and district level facilities as well as proposed access to conversation lands. The road networks have been planned and designed to link with the existing road infrastructure and provide a cohesive road network with safe traffic conditions.
The Springfield Rise project was acquired Stockland Supalai Residential Communities Partnership Pty Ltd on 29 November 2024. As these reports pre-date the acquisition, they contain references to the previous owner of the Project.
Approved Management Plans: EPBC Reference 2013/7057
These management plans have been approved by the Commonwealth Department of the Environment in compliance with the conditions of approval for the development under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Reference: 2013/7057):
- For more information download the Spring Mountain Voluntary Declaration Management Plan
- For more information download the Fauna Management Plan
- For more information download the Village 6 Site Based Management Plan
- For more information download the Village 13 Site Based Management Plan
- For more information download the Haul Road Site Based Management Plan
- For more information download the Village 7 (Partial Area) Site Based Management Plan
- For more information download the Village 7 Site Based Management Plan
- For more information download the Village 6/ 7 Basin Site Based Management Plan
- For more information download the Village 8 Site Based Management Plan
- For more information download the Village 8 Addendum Site Based Management Plan
- For more information download the Village 12 Site Based Management Plan
- For more information download the Village 13 Basin Site Based Management Plan
- For more information download the Village 15 Site Based Management Plan
- For more information download the Mountain Creek Sewer Site Based Management Plan
- For more information download the Village 11 (North) Site Based Management Plan
- For more information download the Village 10 and 11 Site Based Management Plan
- For more information download the Village 12 (Extension) Site Based Management Plan
- For more information download the Mountain Creek Crossing Site Based Management Plan
- For more information download the Village 12 Stormwater Site Based Management Plan
- For more information download the Village 14 Site Based Management Plan
- For more information download the Town Centre Gully West Site Based Management Plan
- For more information download the Village 16 Site Based Management Plan
- For more information download the Village 17 Site Based Management Plan
Environment Protection and Biodiversity Conservation Act Annual Compliance Reports: EPBC Reference 2013/7057
- For more information download the Spring Mountain EPBCA Annual Compliance Report – Year 1.pdf
- For more information download the Spring Mountain EPBCA Annual Compliance Report – Year 2.pdf
- For more information download the Spring Mountain EPBCA Annual Compliance Report – Year 3.pdf
- For more information download the Spring Mountain EPBCA Annual Compliance Report – Year 4.pdf
- For more information download the Spring Mountain EPBCA Annual Compliance Report – Year 5_optimised.pdf
- For more information download the Spring Mountain EPBCA Annual Compliance Report – Year 6.pdf
- For more information download the Spring Mountain EPBCA Annual Compliance Report – Year 7.pdf
Environment Protection and Biodiversity Conservation Act Compliance Reports: EBPC Reference 2017/7875
- For more information download theWoogaroo heights - Baseline Ecological Report (The Meads Offset Site)
- For more information download the Woogaroo Heights EPBCA Annual Compliance Report – Year 1
- For more information download the Woogaroo Heights EPBCA Annual Compliance Report – Year 2
- For more information download the Woogaroo Heights EPBCA Annual Compliance Report – Year 3
Tree Retention
Existing trees are retained in road reserves and parks where possible to provide a development that blends seamlessly with the natural surrounds.
Water Saving Techniques
Drought tolerant design and native planting have been used in the creation of parks and ovals to minimise the necessity to water these amenities.
Water Quality
The design and construction of the lakes, wetlands and billabongs provide dual outcomes of biodiversity by improving water quality while offering a safe recreational amenity to the local community. The lake system has been stocked with a variety of native fish to improve the water quality and promote a sustainable healthy water system.
Transport
The urban design of Springfield Rise at Spring Mountain incorporates easy access for all residents to public transport. With the arrival of the train in late 2013, residents have access to another form of public transport.
Recycling
Site materials will be reused for the construction of roads which will significantly reduce the amount of materials needed to be brought into Springfield Rise at Spring Mountain. Trees will also be reused as mulch throughout the development as much as possible.
Sustainable Living
If you are interested in finding out what you can do to build a more efficient and sustainable home, our Building Smart guide outlines six smart ideas.